<?xml version="1.0" encoding="utf-8"?>        <rss version="2.0"
            xmlns:content="http://purl.org/rss/1.0/modules/content/"
            xmlns:dc="http://purl.org/dc/elements/1.1/"
            xmlns:atom="http://www.w3.org/2005/Atom">
            <channel>
                <atom:link href="https://english.loktej.com/tag/456/metro-train-project" rel="self" type="application/rss+xml" />
                <generator>Loktej English RSS Feed Generator</generator>
                <title>Metro Train Project - Loktej English</title>
                <link>https://english.loktej.com/tag/456/rss</link>
                <description>Metro Train Project RSS Feed</description>
                
                            <item>
                <title>Surat Metro Speeds Up with Completion of Second Tunnel on Dream City Line</title>
                                    <description>
                        <![CDATA[<p>Surat's Dream City Metro Rail Project Phase-1 is making significant progress with the completion of its second tunnel. This tunnel, constructed by Tunnel Boring Machine (TBM) Narmada, stretches from Labheshwar Chowk to the Central Warehouse on Varachha Road.</p>
<p><strong>TBM Narmada's Impressive Efficiency</strong></p>
<p>The successful completion of this 600-meter tunnel marks TBM Narmada's third achievement within the 3.46 km package on the Sarthana-Dream City line. Notably, the machine had previously completed a 1.5 km tunnel from Kapodra to Labheshwar Chowk in just one year (December 2022 - December 2023).</p>
<p><strong>Underground Route for Diamond Line</strong></p>
<p>This latest tunnel construction is part of</p>...]]>
                    </description>
                
                                    <content:encoded>
                        <![CDATA[<a href="https://english.loktej.com/article/10891/surat-metro-speeds-up-with-completion-of-second-tunnel-on"><img src="https://english.loktej.com/media/400/2024-03/_b30032024-04.jpg" alt=""></a><br /><p>Surat's Dream City Metro Rail Project Phase-1 is making significant progress with the completion of its second tunnel. This tunnel, constructed by Tunnel Boring Machine (TBM) Narmada, stretches from Labheshwar Chowk to the Central Warehouse on Varachha Road.</p>
<p><strong>TBM Narmada's Impressive Efficiency</strong></p>
<p>The successful completion of this 600-meter tunnel marks TBM Narmada's third achievement within the 3.46 km package on the Sarthana-Dream City line. Notably, the machine had previously completed a 1.5 km tunnel from Kapodra to Labheshwar Chowk in just one year (December 2022 - December 2023).</p>
<p><strong>Underground Route for Diamond Line</strong></p>
<p>This latest tunnel construction is part of the Diamond Line, which will see the metro rail running entirely underground between Kapodra and Chowkbazar. In contrast, other sections of the Sarthana-Dream City line (total length 22.77 km) will utilize elevated tracks. An entirely separate textile line, running from Antroli to Bhensan, will also be constructed entirely above ground.</p>
<p><strong>Contractors Geared Up for Project Completion</strong></p>
<p>Gulemark and Sam India contractors are responsible for building a total of six tunnels and three stations along the Sarthana-Dream City line. The project's swift progress bodes well for its timely completion.</p>]]>
                    </content:encoded>
                
                                                            <category>Surat</category>
                                    

                <link>https://english.loktej.com/article/10891/surat-metro-speeds-up-with-completion-of-second-tunnel-on</link>
                <guid>https://english.loktej.com/article/10891/surat-metro-speeds-up-with-completion-of-second-tunnel-on</guid>
                <pubDate>Sat, 30 Mar 2024 20:05:56 +0530</pubDate>
                                    <enclosure
                        url="https://english.loktej.com/media/2024-03/_b30032024-04.jpg"                         length="123978"                         type="image/jpeg"  />
                
                                    <dc:creator>
                        <![CDATA[Loktej English Team]]>
                    </dc:creator>
                            </item>
            <item>
                <title>Ahmedabad-Gandhinagar Metro Makes Progress: Trial Run to Begin Soon</title>
                                    <description>
                        <![CDATA[<p>The Ahmedabad-Gandhinagar Metro project is nearing completion, with trial runs expected to begin soon on a critical stretch. The Gujarat Metro Rail Corporation (GMRC) is working diligently to launch a pre-trial run from Motera Stadium to Gandhinagar Sector 1 in March-April.</p>
<p><strong>Pre-Trial Run Conducted on Model Road</strong></p>
<p>A pre-trial run was recently conducted on the iconic Model Road route, constructed at a cost of Rs 32 crore. While the trial run offered a glimpse of the future, it served as a precursor to the official trial run scheduled for the coming months.</p>
<p><strong>20 Km of Phase-II Nearing Completion</strong></p>
<p>The second</p>...]]>
                    </description>
                
                                    <content:encoded>
                        <![CDATA[<a href="https://english.loktej.com/article/10149/ahmedabad-gandhinagar-metro-makes-progress-trial-run-to-begin-soon"><img src="https://english.loktej.com/media/400/2024-02/d23022024-19.jpg" alt=""></a><br /><p>The Ahmedabad-Gandhinagar Metro project is nearing completion, with trial runs expected to begin soon on a critical stretch. The Gujarat Metro Rail Corporation (GMRC) is working diligently to launch a pre-trial run from Motera Stadium to Gandhinagar Sector 1 in March-April.</p>
<p><strong>Pre-Trial Run Conducted on Model Road</strong></p>
<p>A pre-trial run was recently conducted on the iconic Model Road route, constructed at a cost of Rs 32 crore. While the trial run offered a glimpse of the future, it served as a precursor to the official trial run scheduled for the coming months.</p>
<p><strong>20 Km of Phase-II Nearing Completion</strong></p>
<p>The second phase of the Metro, spanning approximately 20 kilometers, is in the final stages. The project includes the construction of 22 stations, including Koteshwar Road, Vishwakarma College, Narmada Canal, GNLU, PDPU, and Mahatma Mandir.</p>
<p><strong>Speedy Work on Shahpur Bridge</strong></p>
<p>The completion of the Shahpur Bridge, a crucial element connecting the Metro across the Sabarmati River, is progressing swiftly. The construction of each span on the bridge is reported to be completed in a record six days.</p>
<p><strong>Public Awaits Faster Connectivity</strong></p>
<p>The trial run announcement has ignited excitement among residents eagerly awaiting the Metro's launch. This project is anticipated to significantly improve connectivity between Ahmedabad and Gandhinagar, facilitating faster and more efficient travel between the two cities.</p>
<p><strong>GMRC's Commitment to Progress</strong></p>
<p>The GMRC's dedication to rapid execution is evident in the project's advancement. The pre-trial run on Model Road and the planned trial run between Motera and Gandhinagar showcase the agency's commitment to bringing this significant infrastructure project to fruition.</p>
<p>The Ahmedabad-Gandhinagar Metro project holds immense potential for transforming the urban landscape of both cities. The upcoming trial run marks a significant milestone and offers a promising glimpse into the future of improved connectivity for the region.</p>]]>
                    </content:encoded>
                
                                                            <category>Gujarat</category>
                                            <category>Ahmedabad</category>
                                    

                <link>https://english.loktej.com/article/10149/ahmedabad-gandhinagar-metro-makes-progress-trial-run-to-begin-soon</link>
                <guid>https://english.loktej.com/article/10149/ahmedabad-gandhinagar-metro-makes-progress-trial-run-to-begin-soon</guid>
                <pubDate>Sat, 24 Feb 2024 12:12:16 +0530</pubDate>
                                    <enclosure
                        url="https://english.loktej.com/media/2024-02/d23022024-19.jpg"                         length="35146"                         type="image/jpeg"  />
                
                                    <dc:creator>
                        <![CDATA[Loktej English Team]]>
                    </dc:creator>
                            </item>
            <item>
                <title>Ahmedabad-Gandhinagar Metro Zooms Closer: Phase 2 Trials Set for March, Passenger Service by Year-End</title>
                                    <description>
                        <![CDATA[<p>The Gujarat Metro Rail Corporation (GMRC) has announced exciting progress on the 20km stretch from Motera to Gandhinagar, with initial testing starting next month. The trial runs will commence between Motera Sector-1 and Gandhinagar, passing through the prominent GIFT City business district.</p>
<p>This development brings the dream of seamless metro connectivity between the two urban centers closer to reality. According to GMRC officials, the entire route, extending up to Mahatma Mandir, is expected to be operational by the end of 2024.</p>
<p>However, with Lok Sabha elections looming, time is of the essence. The GMRC emphasizes the importance of starting trials</p>...]]>
                    </description>
                
                                    <content:encoded>
                        <![CDATA[<a href="https://english.loktej.com/article/9998/ahmedabad-gandhinagar-metro-zooms-closer-phase-2-trials-set-for-march"><img src="https://english.loktej.com/media/400/2024-02/d18022024-18.jpg" alt=""></a><br /><p>The Gujarat Metro Rail Corporation (GMRC) has announced exciting progress on the 20km stretch from Motera to Gandhinagar, with initial testing starting next month. The trial runs will commence between Motera Sector-1 and Gandhinagar, passing through the prominent GIFT City business district.</p>
<p>This development brings the dream of seamless metro connectivity between the two urban centers closer to reality. According to GMRC officials, the entire route, extending up to Mahatma Mandir, is expected to be operational by the end of 2024.</p>
<p>However, with Lok Sabha elections looming, time is of the essence. The GMRC emphasizes the importance of starting trials by mid-March, before the model code of conduct kicks in. "Once the election dates are announced, testing gets restricted," explained an official, highlighting the urgency.</p>
<p>The good news doesn't stop there. After the elections, passenger services will kick off, initially reaching Gandhinagar Sector-1. By year-end, the entire stretch will be open for public use.</p>
<p>Adding to the excitement is the nearing completion of a visually stunning cable-stayed bridge over the Narmada Main Canal, connecting Narendra Modi Stadium to Gandhinagar. This architectural marvel boasts a central span of 145 meters, promising a smooth and scenic journey.</p>
<p>Furthermore, work on other parts of the project is progressing swiftly. The stretch from Thaltej to Thaltej village is also targeted for completion by year-end, along with the opening of the Sabarmati Metro station after the elections.</p>
<p>With dedicated efforts and clear deadlines, the Ahmedabad-Gandhinagar metro is gearing up to revolutionize travel between the two cities. Stay tuned for more updates as this significant infrastructure project inches closer to completion!</p>]]>
                    </content:encoded>
                
                                                            <category>Gujarat</category>
                                            <category>Ahmedabad</category>
                                    

                <link>https://english.loktej.com/article/9998/ahmedabad-gandhinagar-metro-zooms-closer-phase-2-trials-set-for-march</link>
                <guid>https://english.loktej.com/article/9998/ahmedabad-gandhinagar-metro-zooms-closer-phase-2-trials-set-for-march</guid>
                <pubDate>Sat, 17 Feb 2024 21:24:50 +0530</pubDate>
                                    <enclosure
                        url="https://english.loktej.com/media/2024-02/d18022024-18.jpg"                         length="111320"                         type="image/jpeg"  />
                
                                    <dc:creator>
                        <![CDATA[Loktej English Team]]>
                    </dc:creator>
                            </item>
            <item>
                <title>Surat Metro Set to Transform Urban Commuting Prior to Lok Sabha Elections</title>
                                    <description>
                        <![CDATA[<p>SURAT – In an ambitious urban development move ahead of the 2024 Lok Sabha elections, the Surat Metro Rail Project, a plan endorsed by Prime Minister Narendra Modi, is on track to begin operations. The metro route from Sarthana to Dream City is slated to become operational before the year ends, giving the city of Surat an added layer to its identity.</p>
<p>Amidst bustling construction activity, the Surat metro expansion is progressing at an accelerated pace. The city will soon see the construction of two corridors to facilitate both underground and elevated metro trains. According to the timeline, the elevated</p>...]]>
                    </description>
                
                                    <content:encoded>
                        <![CDATA[<a href="https://english.loktej.com/article/2694/surat-metro-set-to-transform-urban-commuting-prior-to-lok-sabha-elections"><img src="https://english.loktej.com/media/400/2023-06/k06062023-13.jpg" alt=""></a><br /><p>SURAT – In an ambitious urban development move ahead of the 2024 Lok Sabha elections, the Surat Metro Rail Project, a plan endorsed by Prime Minister Narendra Modi, is on track to begin operations. The metro route from Sarthana to Dream City is slated to become operational before the year ends, giving the city of Surat an added layer to its identity.</p>
<p>Amidst bustling construction activity, the Surat metro expansion is progressing at an accelerated pace. The city will soon see the construction of two corridors to facilitate both underground and elevated metro trains. According to the timeline, the elevated line connecting Dream City to Sarthana, and from Dream City to Kadarshah Nal Chowkbazar, is expected to be operational by December 2023. The completion of the entire Pura Route is anticipated by December 2024, with the goal of wrapping up both Sarthana to Dream City and Bhensan to Saroli corridors by March 2025.</p>
<p>Yogendra Singh Chauhan, a senior Metro engineer, shared insights into the underground tunnel development, a vital component of the project. With the assistance of tunnel boring machines (TBMs) provided by GMRC, the first TBM was launched in September by the Gulmark agency to construct the 1.2 km tunnel from Kapodra to Labheshwar Chowk. A second TBM has been employed to create an adjacent track. While both corridors are set to be functional by March 2025, the Sarthana to Dream City line will be up and running by December 2023.</p>
<p><img src="https://english.loktej.com/media/2023-06/k06062023-13.jpg" alt="k06062023-13"></img></p>
<p>The Metro Rail Project, advancing at a rapid speed, is poised to reshape the urban face of Surat city. A significant portion of this includes an underground metro route, construction for which is nearing completion. The first of the two corridors will connect Sarthana to Dream City, while the second will join Bhensan to Saroli. Among the total 40.35 km of both Surat Metro Rail routes, the 21.61 km stretch linking Sarthana to Dream City has seen substantial progress.</p>
<p>Nicknamed as the Diamond Corridor, the Sarthana to Dream City route will be a major artery in the city's transport system. Meanwhile, the Bhensan to Saroli route, rich in cloth markets and referred to as the Textile Corridor, will commence in the second phase. This phase includes an 18.84 km corridor that will integrate the areas of Udhna Darwaza, Kamela Darwaza, Anjana Farm, Model Town, and Magob.</p>
<p>The Surat Metro project aims to redefine the city's transport infrastructure, aligning with Surat's stature as a rapidly growing urban centre.</p>]]>
                    </content:encoded>
                
                                                            <category>Surat</category>
                                    

                <link>https://english.loktej.com/article/2694/surat-metro-set-to-transform-urban-commuting-prior-to-lok-sabha-elections</link>
                <guid>https://english.loktej.com/article/2694/surat-metro-set-to-transform-urban-commuting-prior-to-lok-sabha-elections</guid>
                <pubDate>Tue, 06 Jun 2023 19:52:18 +0530</pubDate>
                                    <enclosure
                        url="https://english.loktej.com/media/2023-06/k06062023-13.jpg"                         length="65866"                         type="image/jpeg"  />
                
                                    <dc:creator>
                        <![CDATA[Loktej English Team]]>
                    </dc:creator>
                            </item>
            <item>
                <title>Surat Metro Rail Project Progresses with Tunnel Boring Machines </title>
                                    <description>
                        <![CDATA[<p>Surat - The ambitious Surat Metro Rail project is advancing rapidly, with plans for elevated and underground stations spanning a total of 42 km in the city. In the first phase, a 6.47 km underground route is being constructed with the help of Tunnel Boring Machines (TBMs) operated by GMRC.</p>
<p>Gulmark Agency initiated the use of a TBM machine in September to build a tunnel from Kapodra to Labeshwar Chowk (1.2 km), with another TBM machine deployed for an adjacent track. Gulmark Company is responsible for constructing the tunnel from Kapodra to Surat Railway Station, with the section from Kapodra</p>...]]>
                    </description>
                
                                    <content:encoded>
                        <![CDATA[<a href="https://english.loktej.com/article/1055/surat-metro-rail-project-progresses-with-tunnel-boring-machines"><img src="https://english.loktej.com/media/400/2023-03/loktej-english-defult-news-image.jpg" alt=""></a><br /><p>Surat - The ambitious Surat Metro Rail project is advancing rapidly, with plans for elevated and underground stations spanning a total of 42 km in the city. In the first phase, a 6.47 km underground route is being constructed with the help of Tunnel Boring Machines (TBMs) operated by GMRC.</p>
<p>Gulmark Agency initiated the use of a TBM machine in September to build a tunnel from Kapodra to Labeshwar Chowk (1.2 km), with another TBM machine deployed for an adjacent track. Gulmark Company is responsible for constructing the tunnel from Kapodra to Surat Railway Station, with the section from Kapodra to Labheshwar Chowk being completed in the first phase. Both TBMs are now operational at the site.</p>
<p>J. Kumar Infra has recently installed a TBM machine in Chowkbazar, and unloading of tunnel boring machine parts for the underground tunnel has begun. Excavation of the tunnel is expected to start in May following the assembly of TBM parts.</p>
<p>Initially slated for an April start, the construction of rings using the TBM machine is likely to begin three days earlier, with tunneling work commencing by May. Although the cutting speed of the TBM is initially slow, the machine is </p>
<p>designed to work more efficiently and quickly over time. J. Kumar Infra will construct the tunnel to accommodate three underground metro stations: Chowkbazar, Maskati, and Surat railway station.</p>
<p>The Surat Metro Rail project aims to improve public transportation and ease traffic congestion within the city. The swift progress in constructing the underground route from the station to Chowkbazar highlights the commitment to providing Surat residents with efficient and modern transport options.</p>]]>
                    </content:encoded>
                
                                                            <category>Surat</category>
                                    

                <link>https://english.loktej.com/article/1055/surat-metro-rail-project-progresses-with-tunnel-boring-machines</link>
                <guid>https://english.loktej.com/article/1055/surat-metro-rail-project-progresses-with-tunnel-boring-machines</guid>
                <pubDate>Tue, 28 Mar 2023 16:00:59 +0530</pubDate>
                                    <enclosure
                        url="https://english.loktej.com/media/2023-03/loktej-english-defult-news-image.jpg"                         length="38057"                         type="image/jpeg"  />
                
                                    <dc:creator>
                        <![CDATA[Loktej English Team]]>
                    </dc:creator>
                            </item>
            <item>
                <title>Surat's Metro Rail Project Progresses as TBM Parts rolled out for Underground Tunnel</title>
                                    <description>
                        <![CDATA[Surat's ambitious Metro Rail project is set to progress as parts of the tunnel boring machine (TBM) have been rolled out for the construction of the underground metro tunnel in Chowkbazar.]]>
                    </description>
                
                                    <content:encoded>
                        <![CDATA[<a href="https://english.loktej.com/article/688/title--surat-s-metro-rail-project-progresses-as-tbm-parts-rolled-out-for-underground-tunnel"><img src="https://english.loktej.com/media/400/2023-03/news-photo15.jpg" alt=""></a><br /><p>Surat's Metro Rail project is moving ahead at full speed with plans to build elevated and underground stations on a 42 km route. The first phase will see a 6.47 km underground route built in the city with the help of a tunnel boring machine (TBM).</p>
<p>Currently, the Gulmark agency has launched a TBM machine to construct a 1.2 km tunnel from Kapodra to Labheshwar Chowk. Another TBM machine has also been launched for another track next to this tunnel. J.Kumar Infra has started unloading TBM machine parts in Chowkbazar.</p>
<p>The contractor is set to start ring construction in April and tunneling in May. The tunnel from Kapodra to Surat Railway Station will be constructed by Gulmark Company, with the tunnel being prepared from Kapodra to Labheshwar Chowk in the first phase. Both TBMs have been commissioned at the site.</p>
<p>The TBM machine will start with a slow cutting speed, but work will gradually become faster. J.Kumar will construct tunnels for three underground metro stations, namely Chowkbazar, Maskati, and Surat railway stations.</p>
<p>The progress of Surat's Metro Rail project is set to bring significant changes to the city's transportation system, providing citizens with a more efficient and sustainable mode of travel.</p>]]>
                    </content:encoded>
                
                                                            <category>Surat</category>
                                    

                <link>https://english.loktej.com/article/688/title--surat-s-metro-rail-project-progresses-as-tbm-parts-rolled-out-for-underground-tunnel</link>
                <guid>https://english.loktej.com/article/688/title--surat-s-metro-rail-project-progresses-as-tbm-parts-rolled-out-for-underground-tunnel</guid>
                <pubDate>Sun, 12 Mar 2023 20:30:20 +0530</pubDate>
                                    <enclosure
                        url="https://english.loktej.com/media/2023-03/news-photo15.jpg"                         length="82071"                         type="image/jpeg"  />
                
                                    <dc:creator>
                        <![CDATA[Loktej English Team]]>
                    </dc:creator>
                            </item>

            </channel>
        </rss>
        